BIM Planner System (BPS)

Lean4Team Digital Project Management

BIM Planner System (BPS)

  • The BIM Planner System is a digital, graphical, transparent and collaborative strategy and methodology to organize projects and processes.
  • The BIM Planner system is a digital tool for the BIM manager.
  • The BIM manager is the board administrator. All other team members are board users.

The BPS based on Lean4Team includes:

  • BIM Execution Plan (BEP) / BIM Abwicklungsplan (BAP)
  • Lean Construction
  • Last Planner Systems (LPS)
  • ISO 9001:2015 / DIN EN ISO 9001:2015

 

BIM Phases, BEP, Process/Involved, BPS

BPS Process Boards

  • BPS Planning includes the BIM phases of development and planning as well as documentation support for buildings, structures and infrastructures.
  • BPS Construction includes the BIM phase of construction with remedial work and documentation support after the completion of buildings, structures and infrastructures.
  • BPS Quality Management contains the preparation of relevant cases and occurrences for quality management on the basis of ISO / DIN EN ISO 9001: 2015.
  • If required, the three process boards work together via so-called “shared lanes”.

 

BPS „Shared Lanes“